Jansz-lo Compression Project

Project: Waitsia Stage 2 Gas Project

Client: AkerSolutions

Location: Northwest Cape, WA

Australia The Jansz-Io field is situated approximately 200 kilometres offshore from the north-west coast of Western Australia, at a depth of approximately 1,350 meters below the surface. This field is an integral component of the Chevron Australia-operated Gorgon Project.

SCOPE OF WORK:

  • Front-End Engineering Design (FEED) of a subsea compression station aimed at enhancing gas recovery from the field.
  • Within this FEED scope, we will also design an unmanned power and control floater while providing comprehensive field system engineering services.
  • Development and delivery through Concept-Select phase integrated level 3 FEED schedule and Level 2 execution schedule.
  • This alignment of schedules with the project cost estimate ensures that all resource requirements are meticulously documented in the Basis of Schedule.
  • We are proud to announce that Aker Solutions has been successfully awarded the FEED contract.

More PROJECTS

Westconnex Project – M4 

Development and ongoing support of Level 4 Construction baseline schedule for M4 Western scope of works. Resourced schedule for labour and non-labour requirements.

Westconnex Project  – M5 

Development and ongoing support of Level 4 Construction baseline schedule for M5 Eastern scope of works. Resourced based schedule for Labour and non-labour requirements.
Development of Basis of schedule and presentation to client.

Ichthys Phase 2 Project

Development and monitoring of project schedule and detailed deliverable list.